Construction Updates

August 15, 2019:

Construction on ORBT platforms will begin soon! The construction team began site preparation and equipment mobilization this week to break ground at the Westroads Transit Center later this month.

Due to the coordination needed to complete both elements at each site efficiently, the construction process will require flexibility. Here’s what to expect:

  • 3 crews will work in tandem on platforms on the north side of Dodge Street from the Westroads Transit Center to downtown, where they will shift to the south side of Douglas and work west. Construction will temporarily close sections of the adjacent travel lanes. Road closures will be shared in advance.
  • To expedite construction, the team may be working on as many as 15 stations simultaneously, with anywhere from 6-8 road closures at once.
  • Canopies are being manufactured and assembled off-site to reduce road closures. When a site is ready, the platform will be transported to Omaha and craned into place.
  • Sidewalk access may be limited due to space constraints and safety concerns, so pedestrians will be encouraged to use alternate routes until construction at each site is completed. Pedestrians will be encouraged to use alternate routes until construction at each site is completed. Curb ramps will not be disturbed, providing access to intersections.

Stay up to date on ORBT construction on this page, by signing up for the ORBT Dispatch Newsletter, or by following ORBT on Twitter.

Future Construction

Information coming soon.

Metro Bus Stops

Bus stops near future ORBT sites have been relocated for pedestrian and rider safety during construction. They will remain in the relocated location until ORBT begins operation next spring. Check out the rider alert on ometro.com, or click here to view a full size map!